Est. reading time:
Font:
Font Weight:
Text Size:
Width:
Create an account for enhanced personalisation!
Southern Railway 2-NOL | |
---|---|
In service | 1934 β 1959/60 |
Built at | Eastleigh Works |
Constructed | 1934β1936 |
Number built | 78 units |
Number scrapped | All |
Formation | 2-car set: DMBTβDTC |
Fleet numbers | Sets: 1813β1890 |
Capacity | 24 first class, 135 third class |
Operators | Southern Railway, British Railways |
Specifications | |
Car body construction | Wooden body on a steel underframe |
Train length | 129Β ft 6Β in (39.47Β m) |
Width | 9Β ft 2Β in (2.79Β m) |
Weight | 70 long tons (71Β t; 78 short tons) |
Electric system(s) | 750 V DC Third rail |
Current collector(s) | Contact shoe |
Track gauge | 4Β ftΒ 8+1β2Β in (1,435Β mm) |
The Southern Railway (SR) gave the designation 2-NOL to the electric multiple units built during the 1930s from old London and South Western Railway carriage bodies on new underframes. None of these units survived long enough in British Rail ownership to be allocated a TOPS class.
The 2-NOL (2-car NO Lavatory stock, numbers 1813β1890) units were built in 1934β1936 by taking former LSWR carriage bodies, lengthening them, and placing them on new underframes. They were intended for use on slow services on the South Coast and in South London.
The motor third brakes were produced by taking a 48-foot eight-compartment third (378 of which were built between June 1894 and December 1902 of which 32 were originally 2nd/3rd composites), removing half of one compartment, and adding on a steel-panelled guard's van and a driving cab. The driving trailer composites were also produced from 48-foot eight-compartment thirds, but two whole compartments were removed, and three first-class compartments from a 46-foot six-compartment lavatory first (70 of which were built between 1895 and 1900) were added at one end, and a steel-panelled driving cab at the other.
Initial formations of these units were as follows (carriages were not necessarily formed in numerical order):
Unit Numbers | DMBT | DTC |
---|---|---|
1813β1823 | 9861β9871 | 9940β9950 |
1824β1862 | 9872β9910 | 9961β9999 |
1863β1882 | 8596β8615 | 9920β9939 |
1883β1890 | 9781β9788 | 9913β9919 |
Four units were withdrawn between 1941 and 1955. Of these, two units (1828 and 1855) were withdrawn in 1941, one being the result of bomb damage. Two units sustained accidents in 1951, damaging one coach in each unit; but it was possible to form one good unit from the two undamaged coaches, so only one unit (1838) needed to be withdrawn. Unit 1853 withdrawn following an accident at Barnes in December 1955, as detailed above. The majority of these units were withdrawn between 1956 and 1959, when the old bodies were scrapped and the underframes were re-used. Four units (1870/1/7/8) donated their frames to new 4-EPB coaches, but the frames from 70 units were used to construct 34 new 2-EPB and 36 new 2-HAP units. There remained 31 units in stock in the Summer of 1959, but they had all been withdrawn by the end of August 1959.
Southern Railway 2-NOL | |
---|---|
In service | 1934 β 1959/60 |
Built at | Eastleigh Works |
Constructed | 1934β1936 |
Number built | 78 units |
Number scrapped | All |
Formation | 2-car set: DMBTβDTC |
Fleet numbers | Sets: 1813β1890 |
Capacity | 24 first class, 135 third class |
Operators | Southern Railway, British Railways |
Specifications | |
Car body construction | Wooden body on a steel underframe |
Train length | 129Β ft 6Β in (39.47Β m) |
Width | 9Β ft 2Β in (2.79Β m) |
Weight | 70 long tons (71Β t; 78 short tons) |
Electric system(s) | 750 V DC Third rail |
Current collector(s) | Contact shoe |
Track gauge | 4Β ftΒ 8+1β2Β in (1,435Β mm) |
Last updated 24 June 2025. All information and images sourced from the relevant Wikipedia article(s) unless stated otherwise. If any information is incorrect, please let us know by emailing us: [email protected]. Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms apply.