British Rail Class 799

British Rail Class 799
HydroFLEX
The prototype unit, number 799001
Manufacturer
Family nameBR Second Generation (Mark 3)
Constructed2019, 2021
Number built2
Number scrapped1
Formation4 cars per unit
Fleet numbers799001, 799201
Specifications
Car body constructionSteel
Car length
  • Outer vehicles:
    19.830Β m (65Β ft 0.7Β in)
  • Intermediate vehicles:
    19.920Β m (65Β ft 4.3Β in)
Width2.816Β m (9Β ft 2.9Β in)
Height3.774Β m (12Β ft 4.6Β in)
WheelbaseOver bogie centres: 14.17Β m (46Β ft 6Β in)
Prime mover(s)Ballard FCveloCity
Engine typeHydrogen fuel cell
HVACElectric heating
Electric system(s)
Current collector(s)
Braking system(s)Electro-pneumatic (disc)
Safety system(s)
Coupling systemTightlock
Track gauge1,435Β mm (4Β ftΒ 8+1⁄2Β in) standard gauge


The British Rail Class 799 HydroFLEX is a prototype class of bi-mode multiple unit adapted from Class 319 electric multiple units (319001/382). The existing 25Β kV AC and 750 V DC equipment has been retained with a hydrogen fuel cell added, currently taking up one of the carriages.

History


The Class 319 units were built by BREL between 1987 and 1990 for Network SouthEast, as dual-voltage units to run on Thameslink services. In late 2014, Govia Thameslink Railway began returning its allocation of Class 319 units to Porterbrook (the owner of the units) as they were gradually replaced by Class 387 units and then ultimately Class 700 units on Thameslink services.

In September 2018, Porterbrook announced it would develop a hydrogen fuel cell demonstrator in partnership with the University of Birmingham's Centre for Railway Research and Education. In December 2018, Porterbrook procured an FCveloCity fuel cell unit from Ballard Power Systems.

The first unit was converted from a Class 319 unit that had last been used by Govia Thameslink Railway. It was unveiled on 20 June 2019. In June 2019, it was announced that approval for mainline testing of the unit (branded as HydroFLEX) had been granted after a period of demonstration at Rail Live 2019.

The first mainline testing occurred in September 2020, reaching 50Β mph (80Β km/h) through Warwickshire. The next phase of the development of this prototype is move the hydrogen tanks and fuel cell from one of the carriages and suspend them beneath the train.

A second unit was presented at the COP26 Summit at Glasgow with one of the DT car's passenger doors removed and permanently sealed. The TSOL has also been reconfigured with a boardroom-styled interior specially for the summit.

Fleet details


Subclass Quantity converted Year converted Cars per unit Unit numbers Converted from Notes
799/0 1 2019 4 799001 319001 Scrapped.
799/2 1 2021 799201 319382 Unveiled at COP26 in Glasgow.


Last updated 24 June 2025. All information and images sourced from the relevant Wikipedia article(s) unless stated otherwise. If any information is incorrect, please let us know by emailing us: [email protected]. Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms apply.